Discrete Simulation Project

MIT License Documentation

📝 Project Description

The manufacturing facility produces different products (P1, P2, P3) using different combinations of raw components (C1, C2, C3). The components are cleaned and repaired by two inspectors before being sent to workstations (W1, W2, W3) that have buffers for storing them. The inspectors may get blocked if the buffers are full. The workstations start assembling products when they have all the required components. Inspector 1 sends component C1 to the workstation with the shortest queue, while Inspector 2 sends components C2 and C3 randomly. To produce the three products, the following combinations of components are used: P1 is made from C1, P2 is made from C1 and C2, and P3 is made from C1 and C3.

This repository showcases my term project for SYSC4005, in which I developed a discrete simulation model of a manufacturing facility based on the given problem statement. The purpose of this simulation study was to identify and evaluate an alternative operating policy that could enhance the system performance.

📖 Table of Contents

📋 Prerequisites

⚙️ Setup

  1. Clone this repository to your local machine.
git clone https://github.com/vikiru/discrete-sim.git
cd discrete-sim
  1. Install all required Python dependencies.
pip install -U -r requirements.txt

🚀 Running the Simulator

This repository contains two simulators that model the behavior of a manufacturing facility under different operating policies. The original simulator implements the current policy that the facility follows, while the alternate simulator tests the current policy against the alternative policies that I have devised based on various criteria.

The original simulator runs for a fixed time period of t = 10000 units while the alternate simulator runs for a fixed time period of t = 50000 units. Every unique operating policy is repeated 10 times to obtain statistical estimates of the system performance in both simulators.

The original simulator can be started as follows:

python simulator.py

The alternate simulator can be started as follows:

python alternate_simulator.py

💡 Understanding the Results

The data folder contains the input data that is required for the simulation of the manufacturing facility. This data includes the servicing times of the inspectors who check the quality of the components, and the processing times of the workstations that assemble the components into products.

The policy comparison folder contains a text files that compare the performance of the original policy and the four alternative policies that were proposed to improve the efficiency of the facility. Each policy was simulated for a time period of t = 50000 units, which represents the duration of the production cycle.

The results folder contains sub-folders for each policy, where the simulation results are stored as .txt files. Each file contains information such as the number of products produced, the average waiting time of the workstations, and the utilization rate of the workstations.

✨ Acknowledgments

  • NumPy for generating random values based on an exponential distribution
  • SciPy for statistical functions
  • SimPy to simulate the manufacturing facility
  • MkDocs to generate documentation from Markdown files
  • Material for MKDocs as the theme for MkDocs website
  • GitHub Pages to host the documentation website
  • Shields Badges for repository badges

©️ License

The contents of this repository are licensed under the terms and conditions of the MIT license.

MIT © 2023-present Visakan Kirubakaran.